At a hydroelectric power plant, the water pressure head is at a height of 300 m and the water flow available is 100 m3s1. If the turbine generator efficiency is 60%, estimate the electric power available from the plant (g = 9.8 ms2).
Solution:  
Workdone by liquid pressure = pressure × volume shifted power of flowing water
Hydro-power =
Work
time
= pressure ×
volume
time

Hydro-power = hρg × (V/t) = 300 × 103 × 9.8 × 100 = 29.4 × 107 Watt
Efficiency of turbine η =
Electricpower
Hydropower
⇒ 0.6 =
Electricpower
29.4×107

Electric power = 0.6 × 29.4 × 107 = 176.4 × 106 W = 176.4 MW