(3) Prime Minister Narendra Modi is formally dedicated the Tuirial Hydro Electric Power Project (HEPP) in Mizoram to the nation on December 16, 2017. ‘MyDoNER App’ was also be launched by him and cheques were distributed to the start-up entrepreneurs in Aizawl. The 60MW Tuirial HEPP has been constructed as a Central Sector Project and implemented by North Eastern Electric Power Corporation (NEEPCO) under the administrative control of the Union Power Ministry.