Positive error: These errors make the measured length more than the actual length which results into wrong calculations by the Surveyor.Examples:● The length of chain is shorter than the standard length due to bending of links, removal of connecting rings and knots in links.● The temperature is lower than at which the tape was calibrated.● Not applying sag correction.● Sag takes place due to self weight of the chain. ● Incorrect alignment