SSC CHSL 2 July 2019 Shift 2 Solved Paper

Show Para  Hide Para 
Question Numbers: 10-14
In the following passage, some words have been deleted. Fill in the blanks with the help of the alternatives given. Select the most appropriate option for each blank.
Trade on the New York Stock Exchange was (1) ______ to a standstill on an autumn day (2) ______ 1994. The culprit for the outage (3) ______ a squirrel that had chewed through a power line near the computer centre of the (4) ______ in Trumbull, Connecticut. The shutdown (5) ______ lasted for half-an-hour, resulted in the NYSE operating at 85 percent capacity.
© examsnet.com
Question : 12
Total: 100
Go to Question: