Bed level of Canal = + 171.00 m; Full Supply depth of Canal = 1.60 m; Bed level of Drain = + 169.20 m; High Flood Level of drain = 169.20 + 2.50 m = 171.70 m From the given data, We can conclude that HFL of the drain is higher than the bed level of canal (171.70 m > + 171.00 m) and bed level of canal is higher than the bed level of drain, (+ 171.00 m > + 169.20 m) so the suitable type of cross drainage structure is syphon aqueduct.